Pleased to meet you cleocin goodrx As detailed variously in the charging instruments filed against Halliburton and against Badalamenti, during the relevant time period Badalamenti was Halliburton’s cementing technology director. In May 2010, in connection with Halliburton’s internal post-incident examination of the Macondo well, Badalamenti directed a senior program manager for Halliburton’s Cement Product Line (Program Manager) to run two computer simulations of the Macondo well final cementing job using Halliburton’s Displace 3D simulation program. Displace 3D was a next-generation simulation program that was being developed to model fluid interfaces and their movement through the wellbore and annulus of a well. The modeling sought to compare the 21 centralizers Halliburton had recommended to BP versus the six centralizers BP ultimately used. As detailed in the charging documents, the simulations indicated to those present that there was little difference between using six and 21 centralizers on the Macondo well. Badalamenti directed Program Manager to destroy these results, and Program Manager did so.